New public port of Luino

address: via Dante Alighieri

Latitude: 45° 59' 55.92'' N
Longitude: 08° 44' 02.83'' E

The new public port of Luino is of great dimensions and it is characterized by an ample entry of easy access, the bottom is deep and sandy, the spaces to maneuver are excellent; the places boat are on floating docks, inside there is a big ramp of towing for all unities (1), (2). The places are assigned by Autorità di Bacino Lacuale dei laghi Maggiore, Comabbio, Monate e Varese. In the night, the entry is signalled by the typical turrets red and green.

 

Following we propose some images:

entry (1), (2)

landing view (1), (2), (3)

lake view (1), (2)

 

TECHNICAL DATES
CHARACTERISTICS
SURVEY
ADDITIONAL NOTES
DIFFICULTY OF ACCESS
*
DIFFICULTY OF MOORING
*
BOTTOM'S TIPOLOGY
sandy/muddy
BOTTOM'S DEEP
middly deep
SPACES OF MANOEUVRE
excellent
BOAT PLACES
121
BOATS DIMENSIONS
not more 10 mt.
motorboats and sails
TEMPORARY MOORING
YES
on pier "F" nr. 4 places for temporary mooring (time limit: 4 hours), nr. 1 for emergencies mooring and nr. 2 for emergency and vigilance mooring
MOORING FOR DISABLED
NO
CRANE FOR DISABLED
NO
ELECTRICITY
NO
PUMP FOR FILTHY WATER
NO
DRINKABLE WATER
NO
PUBLIC WC
NO
PUBLIC GARDEN
YES
in the immediate proximities
PARK AUTO
YES
in the immediate proximities
PARK MOTO
YES
in the immediate proximities
LEGEND
* / **
simple or little difficulty
***
some difficulties in phase of access and mooring
**** / *****
difficult and binding access/mooring
 

 

GENERAL VOTE

9 : it is situated in strategic position - in the area there are safety structures for the recreation navigation

 

 

 

REGULATION FOR THE USE OF MOORING PLACES

View the "Schema di regolamento per la gestione, valorizzazione e promozione del demanio lacuale" in .pdf (137 kb, Italian version)

 

 

NOTICE FOR ALLOCATION OF MOORING PLACE FOR YEARS 2025 - 2030

View the "Bando per l'assegnazione dei posti d'ormeggio pubblici anni 2025-2030 - porti pubblici e aree d'ormeggio in zona portuale e fuori zona portuale", in .pdf (531 kb, Italian version)

View the "Avviso del bando per l'assegnazione dei posti d'ormeggio pubblici anni 2025-2030 - porti pubblici e aree d'ormeggio in zona portuale e fuori zona portuale", in .pdf (490 kb, Italian version)

View the "Allegato 1 - Contingenza e caratteristiche dei posti d'ormeggio", in .pdf (2,17 Mb), Italian version)

View the "Allegato 2 - Planimetrie porti e strutture d'ormeggio", in .pdf (7,08 Mb, Italian version)

View the "Domanda di rilascio concessione per posto d'ormeggio pubblico - porto pubblico e area d'ormeggio in e fuori zona portuale - Bando 2025-2030", in .pdf (532 kb, Italian version)

 

Click here to get Adobe Reader